![]() |
|||||||
![]() | |||||||
![]() | |||||||
This turn-key construction project consisted of the installation of a 425' coil steel pickle line as manufactured by Pro-Eco. We performed all rigging, equipment setting, equipment assembly, alignment, grouting, process and hydraulic piping, electrical power and instrumentation, startup and commissioning within a 5 month period. | |||||||
![]() |
|||||||
![]() |
|
||||||
Green Contracting Company, Inc. |
|||||||