This project consisted of fabricating and erecting complex process equipment (4 compartment bin, approximate size 25' x 20') within the Calcium Carbonate Plant. The equipment was installed with a crane to a height of 40', and lowered through the roof down into room. This job included installation of 1,000 ton capacity bins, hoppers, blowers and associated piping. This project was completed on a tight schedule using special rigging. All work was performed in an occupied setting. | |||||||
![]() |
|||||||
![]() |
|
||||||
Green Contracting Company, Inc. |
|||||||