College of Notre Dame of MD

This project consisted of the design, layout and installation of a pre-insulated HVAC piping system, potable water, fire protection, and technology ductbank to provide the backbone of the campus wide expansion program.

From tie-ins at the existing Central Power Plant, Green provided 2,000 feet of 16" chilled water and 12" hot water pre-insulated conduits with valved service manholes at regular intervals.

We installed 3000 feet of 12 and 6-way technology ductbank serving the campus wide fiber-optics requirements and connected all buildings allowing for future expansion.

Design Build Underground Utilities