Green Contracting was the general and mechanical contractor for this project. The scope of work included installing a 4,000 S.F. building addition, furnishing and installing two 80,000 PPH "D" boilers, two new D.A. tanks, a new feed water and condensate pump. All feedwater and condensate piping was replaced as were existing controls. A new DCS System was installed. Green Contracting was responsible for receiving the four new fuel trains for replacement on four existing boilers, replacement of safety valves, and installation of a 4,400 feet of 8" gas main. Additional work included installing new condensate tanks, feed water pumps and condensate pumps. | |||||||
![]() |
|||||||
![]() |
|
||||||
Green Contracting Company, Inc. |
|||||||