This project required demolition of existing fuel loading and unloading systems, installation of temporary systems to maintain services, and installation of new piping for #2 fuel oil, heating oil, reformulated gasoline and jet fuel. The new system also included the installation of vertical pumps, air eliminators, fuel quality meters, positive displacement meters, control valves, and a pressure relief cascade system. | |||||||
![]() |
|||||||
![]() |
|
||||||